Data Center Simulator

This simulator generates probabilistic loads profiles for data centers both as a standalone application and an explicit load modifier.

Project realization

Representing Whether, When, and How Much Load Materializes

Data center scenarios carry a project realization probability, an energization date, anticipated delays, a load realization factor, and a ramp-up trajectory through startup.

Probability-weighted project pipeline2032
AnnouncedExpectedP10P90
6 GW30202620302035
ANNOUNCED
EXPECTED LOAD
P10–P90
EXPECTED WORKLOAD MIX

Long-term profile

Generating 8,760-Hour Profiles for Planning and Market Studies

Long-term profiles represent annual operating shape, load factor, hourly coincidence with weather, and the timing of demand impacts across planning years.

8,760-hour annual overviewSelected day
100%50%JanAprJulOctDec
Selected day · 24 hours
Expected P10 P90
100%50%0006121823
Selected hour · 20 seconds
Expected P10 P90
100%50%0 s1020 s
Illustrative 400 MW site

Short-term profile

Modelling Second-Scale Behavior and Local Operating Impacts

Short-term profiles can represent ramps, variability, operating transitions, backup transitions, and other high-resolution behaviors relevant to local grid impacts.